Septic System Installation
New systems and replacements, permit through final inspection.
Learn more about Septic System Installation
Building on a lot with no sewer means the septic system is on the critical path. Soil work, design, and permitting all happen before anyone digs, and the county inspects at set stages.
New construction septic installation New construction septic installation is the sequence that puts a wastewater system on a previously unbuilt lot: soil evaluation, engineered design, county permit, installation, and final inspection. It runs alongside the building permit.
The soil evaluation happens first and controls the whole design, so a delayed test delays the house.
The situation
The system has to be designed for the house before the house exists. Bedroom count sets the design flow, soil results set the field size and type, and the county has to approve the design before a permit is issued. All of that takes calendar time that has nothing to do with how fast a crew can dig.
Builders who leave septic to the end lose weeks. Soil testing is weather and season dependent, engineered designs take review time, and counties inspect at specific stages that cannot be skipped or done out of order. Starting the process early is the entire difference between a smooth build and a stalled one.
How the job runs
Profile pits and percolation results determine what the lot can support and whether a conventional field or an engineered system is required.
Design flow is based on the house. The soil results and county standards set tank size, field size, and system type.
The design package goes to the county health department. Nothing is dug until the permit is issued.
Tank, lines, and field go in with the county inspecting at required stages before backfill.
The county signs off and the as built record is filed, which is the document the future owner will need at transfer.
Why us
What it costs
Soil conditions and required system type, tank size and field size for the bedroom count, depth, rock, slope, site access, county design and permit fees, and whether a pump chamber or engineered treatment component is required.
Questions
Keep going
New systems and replacements, permit through final inspection.
Learn more about Septic System InstallationWho issues permits and what each Front Range county requires.
Learn more about County Septic Permit GuidesFull system inspection for buyers, sellers, agents, and lenders.
Learn more about Septic Tank InspectionFamily owned and operated, serving Denver and the Colorado Front Range for over 20 years.
Design standards, soil testing, and inspection sequencing are set by the county health department. Start with the guide for the county your lot sits in.